According to the standard construction bidding documents, it mainly includes the following contents.
1 cover format
2 tender announcement and invitation to bid
3 Instructions to Bidders
4 bid evaluation method
5 terms and format of the contract
6 bill of quantities
7 design drawings
8 technical standards and requirements
9 bidding document format
What does bidding mean? Is it a book or something?
Bidding document format
The first part of the invitation to bid
A company's internet website and multimedia system construction project are invited to bid, and your company is invited to bid.
1. Project name: website and multimedia system construction project of a company.
2. Instructions for Bidding: See Part II for details.
3. Project time: as agreed in the contract.
4. Bidding document price: free of charge
5. The tender documents were issued from 8: 00 am to 65: 438+02 to 65: 438+05 (except holidays) and from 8: 00 pm to 65: 38+065: 438+0: 30 to 5: 00 pm on February 2, 2000. ..
6. Deadline for bidding: February 27th, 2000 at 5: 00 p.m. +65438. The bidder must send the bidding documents directly or by mail to a company before this time, and the overdue bidding documents will be rejected.
7. Place of bid: XXX Company
Address: No.239, * * * * * * *
Postal code: **8247
Tel: (0757)**65908
Fax: (0757)**7 1372
E-mail: [[email protected] * * * * * * * * *
Contact: Lei Chun
8. Bidding time: February 30, 2000 17: 00.
9. Place of bid opening: XXX Company
Address: No.239 * * * *.
The second part of the tender instructions
1. Bid fee:
The bidder shall bear all expenses related to this bid, including the preparation and submission of bid documents and other related expenses. No matter what the bidding result is, the tenderer will not bear or share any related similar expenses.
The bidder shall receive the tender documents from the tenderer free of charge within the date specified by the tenderer.
2. Bidding requirements:
Before bidding, the bidder must carefully read the description, charts, conditions and specifications of this tender. If the bidder fails to comply with this requirement, it will miss any information and data provided by the bidder in this tender, or report any items not required in the tender at its own risk, and bear the consequences that may lead to its bid being abandoned.
3. Bidding qualification:
Any unit that holds a valid Business License for Enterprise as a Legal Person issued by the Administration for Industry and Commerce and has the ability to organize the implementation of this project (refers to the ability to design, develop and maintain Internet websites and multimedia systems by itself, and the unit must have both experience in developing Internet websites and multimedia CD-ROM systems and practical experience in developing websites for enterprises).
4. Revision of tender:
At any time before the deadline for bidding, the tenderer has the right to modify the contents of this tender for various reasons (whether it is proposed by the tenderer or caused by the bidder's request for clarification of the contents of the tender).
All bidders who have obtained the bidding documents from the tenderee will be notified in writing of the modification of the bidding documents. At the same time, in order to give bidders sufficient time to reflect all changes in the bidding documents, the tenderer may decide to extend the deadline for submitting bidding documents at its own discretion.
5. Composition of tender:
(1) bidding
(2) Detailed design scheme and overall implementation plan of website construction and multimedia CD-ROM.
(3) acceptance terms of engineering quality and service
(4) Cost estimation table
(5) Other special requirements or instructions.
(6) Attachment:
L power of attorney
L qualification document
L introduction of tendering units
L bid bond guarantee (or deposit)
6. Related expenses:
(1) Bid fee:
Regardless of the practice and results of the bidding process, all expenses incurred in the bidding process shall be borne by the bidding unit itself.
(2) Bid bond:
L the bidder shall pay 5000 yuan to the tenderer. ......
What are the components of the project bidding document?
The contents of the tender documents include the tender announcement (or invitation to bid, as the case may be), instructions to bidders, bid evaluation methods, contract conditions and formats, bill of quantities, drawings, technical standards and requirements, bid document formats and other materials specified in the pre-attached table of the instructions to bidders (the tenderee shall judge by itself according to the specific characteristics of the project, and other materials that need to be supplemented shall be specified in the pre-attached table of the instructions to bidders).
Elements of bidding documents
Bidding documents can be divided into three parts according to their functions: first, bidding announcement or invitation letter, instructions to bidders, bid evaluation methods, bidding document format, etc. , mainly expounds the general requirements of the project subject to tender and the rules of bidding activities, which are binding on all parties involved in the project bidding activities, but generally do not constitute contract documents; Second, the bill of quantities, design drawings, technical standards and requirements, contract terms, etc. A comprehensive description of the requirements of the project subject to tender is not only the main basis for bidding activities, but also an important content of the contract documents, which is binding on the tenderer and the winning bidder; The third is reference materials for bidders to understand and analyze the reference information related to the bidding project, such as project address, hydrology, geology, meteorology, transportation and other reference materials.
What is the content of the tender documents?
Article 18 A bidding procurement unit shall prepare bidding documents according to the characteristics and requirements of the bidding project. The tender documents include the following contents:
(1) Invitation to bid;
(2) Instructions to Bidders (including requirements of sealing, signature and seal, etc. );
(3) Qualification and credit certification documents that the bidder should submit;
(4) Requirements for bid quotation, preparation of bid documents and payment method of bid bond;
(five) the technical specifications, requirements and quantity of the project subject to tender, including attachments and drawings;
(six) the main terms of the contract and the way of signing;
(7) Time of delivery and service provision;
(8) bid evaluation methods, bid evaluation criteria and clauses on the rejection of bids;
(nine) the deadline for bidding, the time and place of bid opening;
(ten) other matters stipulated by the financial department at or above the provincial level.
The bidder shall specify and indicate the substantive requirements and conditions in the tender documents.
Part of the tender documents
For details, please refer to the provisions of the * * * Procurement Law:
Article 18 A bidding procurement unit shall prepare bidding documents according to the characteristics and requirements of the bidding project. The bidding documents include the following contents: (1) invitation to bid;
(2) Instructions to Bidders (including requirements of sealing, signature and seal, etc. );
(3) Qualification and credit certification documents that the bidder should submit;
(4) Requirements for bid quotation, preparation of bid documents and payment method of bid bond;
(five) the technical specifications, requirements and quantity of the project subject to tender, including attachments and drawings;
(six) the main terms of the contract and the way of signing;
(7) Time of delivery and service provision;
(8) bid evaluation methods, bid evaluation criteria and clauses on the rejection of bids;
(nine) the deadline for bidding, the time and place of bid opening;
(ten) other matters stipulated by the financial department at or above the provincial level.
The actual tender documents must include: public tender announcement, tender requirements, instructions to bidders, bid evaluation methods and standards, main terms of the contract, and tender document format.
What is the wbs structure in the bidding documents?
WBS is a work breakdown structure. Generally, it is explained by graphics. Is to break down the project into tasks and then into work content. All the daily work of a project is formed after layers of decomposition.
What are the types of similar project achievements in project bidding? I remember it seems to be 15, but I don't know what it is.
The so-called "similar project" refers to the similarity in structure, scale, area, level, span and project location; Road engineering refers to the similarity of road grade, pavement type and engineering location; Bridge engineering refers to the similarity of structure type, bridge span and engineering position; Other municipal projects refer to projects with similar specialty, scale and project location; The site selection of the project is uniformly divided within and outside the administrative region of this province.
The classification you mentioned refers to: building construction, municipal administration, landscaping, mining, installation and decoration. There are only six categories.
What is the structure of recruits?
Left and right structure
Chinese characters are mostly pictophonetic characters, and pictophonetic characters are mostly left and right structures. It can be seen that it is more important for learners to master the writing of left and right structures.
The characteristics of the left-right structure are: left convergence and right expansion, left loss and right complement, left letting right struggle. The main points of writing are: the left is small and the right is big, the left is big and the right is small, the strokes are thin and dense, and the strokes are few, thick and sparse.
1. "Small on the left, big on the right and flat on the top" refers to writing characters with few and short strokes on the left and many and long strokes on the right, with a large proportion on the right and the upper parts of the left and right parts flush. The ancients called it "the right person might as well be rich alone", "Let the right person stretch right and shrink left" and "the little one on the left is on it". For example:
Work clearly and truly.
Words with the same left and right strokes should also be left small and right big, left low and right high, left contracted and right extended. For example:
From Shuanglin River
2. "Big left, small right and flat down" means writing with more strokes on the left and less strokes on the right. You should make the left side wider and the right side narrower, the left side higher and the right side lower, and the bottom is almost even. The ancients called it "the left-handed man is too big", "Let the left-handed man hold his head high and the right-handed man bow his head" and "all the small ones on the right are under him". For example:
He zhi Kan Qin
If there is a vertical painting on the right, it will be uneven, and the vertical painting is slightly longer than the left. For example:
The six-pointed star removed the sword.
The ways to form left and right structural words are as follows:
1. Opposite type: Haoshukeou
2. Back-to-back type: Zhao Tuo with empty back
3. Anterior-posterior type: Nose seat recumbent spore.
4. Give and take: Red autumn is coming.
5. Side by side: Bamboo feathers and thorns
6. Interpolation: I am embarrassed.
7. intricate: I fell asleep suddenly.