1958.11.05 Xinyu iron and steel company 1# and 2#255m3 blast furnaces broke ground.
1959.07.29 the first workers' congress of Xingang was held.
1960.04 Shanghai No.6 Factory and Huangpu Central Hospital were relocated to Xingang.
Xinzhou Railway 196 1.03 Yuanhe Bridge was opened to traffic, and the whole Xinzhou Line was opened to traffic in June 10.
1962+38+0 # and 2# blast furnaces successfully converted ferromanganese.
1962.12.15 No.2 2#255m3 blast furnace of Xingang was rated as an advanced blast furnace at the blast furnace conference of national metallurgical key enterprises.
1963.04 The Ministry of Metallurgy decided to change the new steel plant by the company.
1965.04.20 Li Fuchun, member of the Political Bureau of the Communist Party of China (CPC) Central Committee and vice premier of the State Council, inspected Xingang.
1965.08. 14803 workshop broke ground, which started the construction of Jiangxi iron and steel plant.
1966.04.23825 workshop 1.5t electric furnace was successfully tested.
1968.12.09438+0 # 58-I 42-hole coke oven project broke ground.
1969.04.0 1 Jiangxi Provincial Party Committee decided that Jianggang would take over the new weekly line. The total length of the new weekly line is 17.8km, of which the first and second stations are 4.5km. 1970.02.2 1 Xingang decided to build a 2300 medium plate workshop with an annual output of10-150,000 tons. /kloc-0 was completed and put into operation in June, 978.
1971.01.035000-6000 ton carbon products workshop started construction.
The Politburo Standing Committee (PSC), Party and State Leader Chen Yun visited Xingang.
1973.09 the project of 24m2 sintering machine in the second sintering workshop of Xingang broke ground.
1978.07 yuan and the completion of the pump expansion project ensured the production and domestic water consumption of Jianggang.
1979. 10 Xingang was identified by Jiangxi province as the first batch of pilot units to expand enterprise autonomy.
1980.05438+0.05438+0 Xingang's family used household gas.
1980.08 The Commission of Science, Technology and Industry for National Defense sent a thank-you letter praising Jiangxi Steel Works for its contribution to the successful launch of China's intercontinental missiles.
1980.11.15 Jiangxi metallurgical department decided that Xinyu metallurgical machinery repair plant was classified as Xingang.
1981.1.01Xingang ferrocarbon was exported to Britain for the first time.
1983.05 Xingang began to organize hot charging of blast furnace molten iron and transported it to Jianggang for steelmaking test.
1984 the Jiangxi provincial government has determined Xingang as the first pilot unit of the factory director responsibility system.
1984.05.0 1600m3 blast furnace broke ground.
1984.05. 10 Xingang to Xinyu gas transmission pipeline project broke ground.
1985.04 the top and bottom combined blowing of 6-ton converter in Xingang was successful.
1985. 1 1 Phase I closed-circuit television project of Xingang was completed.
Xingang 1985 blast furnace ferromanganese won the national silver award.
1986.02.07 Jianggang's 25t oxygen top-blown converter was put into operation.
1986.11.15 Xinhua metal products co., ltd was formally established.
1987.04. 16 The first computer-controlled road scale in Jianggang was put into use.
1988.07. 15 Xingang Pingchuan domestic water diversion project was completed and delivered.
1988.07. 19 Xinhua metal products co., ltd was completed and put into operation.
1988.8. 13 the 25-ton high-power electric furnace of JIANG Steel was put into operation.
1990.06.30. The new steel worker gymnasium covering an area of 2,000 square meters and accommodating 2,000 spectators was completed.
1991.01.06 Jiangxi Steel Works, Xinyu Steel Works and Tiekeng Iron Mine merged to form Jiangxi Xinyu Iron and Steel General Factory.
1992 Xingang raised the first batch of 350 suites to start the housing reform. On July 30th, Park Village broke ground.
1992. 12.25 domestic gas uphill project was completed and put into use.
1993. 12.05 the annual output of new steel is over one million.
1994.09.05 medium plate reconstruction project was completed and put into production.
1995 438+0.06 retired staff activity center completed.
1995.02.07 the central hospital was promoted to a second-class first-class hospital with the approval of the provincial health department, becoming the only enterprise employee hospital in Jiangxi province.
1997. 10.08 The re-employment service center of Xingang Company was unveiled.
1997. 10.28 the company's marine steel plate has been approved by CCS plant.
1998. 12.28 company realizes full continuous casting of converter steel.
1999.03.29 No.2 cupola in No.1 steelmaking plant of the company stopped, ending the 28-year history of cupola steelmaking.
1999.09. 12 Company's 3# ferromanganese blast furnace overhaul project was completed. After the overhaul, No.3 boiler was transformed into pig iron.
1999.09.28 TV optical cable project completed.
On May 29th, 2000, Xingang Company signed a debt-to-equity swap agreement with Huarong, Cinda and Dongfang Asset Management Company in Nanchang, with a debt-to-equity swap of 165438+6425 million yuan. 2000. 10 The Internet website of Xingang Company was officially opened.
200 1.08.08 Xingang Company held the groundbreaking ceremony for two major projects: high-speed wire rod and converter.
200 1.12.18 The annual iron and water capacity of Xingang Company exceeded110,000 tons for the first time.
200 1. 12.28 Xinyu Iron and Steel Co., Ltd., a new debt-to-equity swap company, was established.
On February 26th, 2002, the ferroalloy factory 1# furnace of Xingang Company began to convert to iron.
June, 200218 No.8 Blast Furnace Project of Xingang Company broke ground.
July, 2002.19 Xingang Company held a science and technology conference.
2002. 12. 16 The heat load test run of the high-speed wire rod project of Xingang Company was successful.
On June 30th, 2003, the testing center of Xingang Company passed the laboratory accreditation of China National Accreditation Committee for Conformity Assessment.
From July 65438 to August 2003, Xingang Company held the completion ceremony of high-speed wire rod blast furnace converter and the foundation laying ceremony of thick plate project. Governor Huang Zhiquan announced the completion of the "three major projects" of Xingang Company, and issued the foundation stone laying order for the thick plate project.
2003. 1 1.25 Xingang Company held a ceremony to stop smelting ferromanganese in blast furnace.
2004.082# Coke Oven Overhaul Project was completed and put into production. The 5# sintering machine (180m2) project was completed and put into operation. 7# blast furnace overhaul project completed and put into production.
In September 2004, the daily output of steel, steel and billet in Xingang Company exceeded 1 10,000 tons for the first time.
2004. 10 The commercial house of Qinyuan Village of Xingang Company started construction.
2004.11.16 Xingang Company took the lead in becoming a single enterprise with annual sales revenue exceeding10 billion yuan in Jiangxi Province.
April, 200510 The 3800mm thick plate project of Xingang Company was completed and put into operation.
June 2005: Xingang Company employee poverty alleviation fund was established.
On April 3, 2006, the second passage project of Xinyu Railway was opened to traffic.
In August 2006, the medium plate of Xingang Company was used in the Bird's Nest Project of the 2008 Beijing Olympic Games.
2006. 10 Xingang company technology center was recognized as a national enterprise technology center.
2006. 1 1 Xingang Company started the integration of three QEO systems.
In 2007, Xingang Company started the construction of "Four Bases" to repay the local government and boost the local economy.
In 2007, Xingang Company started the renovation project of nursery and mulberry garden living quarters.
On February 28th, 2007, the groundbreaking ceremony of 3 million tons thin plate project in Xingang was held ceremoniously. Governor Wu attended the ceremony and announced the opening of the training order.
In July, 2007, the company won the honor of "Enterprise Contributing to Olympic Stadium Construction" in China.
In September 2007, Xinhua's non-public offering of A shares was approved by the China Securities Regulatory Commission, and Xingang Company was listed as a whole.
In 2007. 10.09, the company's ship plate output exceeded 1 10,000 tons, and the annual output reached10.36 million tons, ranking first among domestic peers.
In 2007, the company's sales revenue reached more than 22.2 billion yuan and realized profits and taxes of 2.2 billion yuan. The company's sales revenue has maintained double-digit growth for seven consecutive years.
In March 2008, Xingang Company was authorized by the provincial government.
June, 2008.19 Postdoctoral Workstation of Xingang Company was established.
In July 2008, Jiangxi Ocean Steel Engineering Technology Research Center was established in Xingang.
2008.08.2 1 The company successfully issued convertible bonds to raise 2.76 billion yuan.
In February, 2009, the third phase of technical transformation I series project was completed.
corporate vision
Build a 10-million-ton steel enterprise
Create three boutique bases
Build an advanced culture and a long-term foundation.
Beautiful environment and harmonious community
An enterprise where everyone is rich and shares prosperity.
Xingang spirit
Innovation, dedication and transcendence
Business philosophy
Honesty is the foundation and mutual benefit is the law.
Member unit:
Holding and shareholding enterprises
Xinyu Iron and Steel Co., Ltd. (listed company)
Kunming Dian Xin Meng tie co., ltd
Jiujiang Sifang port service logistics co., ltd
Xinyu Xingang Spring Products Co., Ltd.
Xinyu Boda industry company
Shandong boxing Xingang co., ltd
Shanghai Xingang co., ltd
Tianjin Xingang co., ltd
wholly-owned subsidiaries
Xinyu Liangshan mining co., ltd
Xinyu tiekeng mining co., ltd
Fenyi mine
Xinyu Xingang Special Steel Co., Ltd.
Xinyu Xingang welfare enterprise company
Jiangxi Xingang construction co., ltd
Xinyu Xingang cement co., ltd.
Jiangxi Xingang machinofacture co., ltd
Xinyu metallurgical equipment manufacturing co., ltd.
Jiangxi Xingang automobile transport co., ltd
Jiangxi Xin steel slag industry development co., ltd
Hainan Yangpu Wanquan industry co., ltd
Xingang comprehensive service company
Directly affiliated unit
Supply and marketing
Raw material department
sales department
Material setting department
smelt
sintering plant
Pelletizing plant
coke-oven plant
Lime works
First ironmaking plant
Second ironmaking plant
No.1 steelmaking plant
No.2 steelmaking plant
roll
mangle
Electric wire factory
Bar factory
Sheet factory
continuous hot-rolling mill
Cold rolling mill
Electricity, transportation
First power plant
The second power plant
gas plant
department of Transport
Production service department
Inspection, industrial control and design
test center
Automation department
Design institute
Hospital, school
central hospital
community college
Xingang primary school