2./kloc-In the middle and late 9th century, the French chose the eastern route design scheme and planned its construction. Month 190 1 construction started, and 1903 was completed and opened to traffic; Yunnan section 1903 was started, completed on April 1 day 19 10, and the whole line was opened to traffic.
Yunnan-Vietnam Railway starts from Kunming North Station and ends at Haiphong Station in Vietnam. The total length of the line is 859 kilometers (465 kilometers in Yunnan, spanning 394 kilometers). There are 34 stations on the whole line, many of which have been demolished or turned into boarding houses.
4. From June/Kloc-0 to June 65438+6, 2003, the Yunnan section of Yunnan-Vietnam Railway stopped passenger transport together with Bishi Railway due to the impact of Kunming-Honghezhou Highway on the passenger transport revenue of Yunnan-Vietnam Railway, and the railway was aging, leaving only freight, and the crossing section was still dual-purpose.
5. On June 65438+May 2008, the commuter train between Shizui Station in Kunming and Wang Jiaying Station in Chenggong resumed operation as an interval line for tourism and attendance of railway workers.
6.2065438+On February 23, 2003, Yumeng Railway was put into operation, and it was connected with Kunyu Railway, replacing some functions of Kunhe Railway, and Kunhe Railway almost stopped.
On 7.20 14 12 1 day, the reconstruction project of the newly-built electrified double-track railway Kunyu River quasi-gauge railway was completed and the whole line was opened to traffic. 12, 10, Meng He Railway opened passenger transport, that is, the entire Kunyuhe Railway opened passenger transport, connected with Kunming Station, and then opened the train from Hekou North Station to Lijiang Station. Kunhe Railway has been changed into a railway line for auxiliary freight transport and section passenger transport. Since then, the goods import and export of Yunnan-Vietnam Railway have to be changed at Hekou North Station, except for the trains on the meter rail line.
8.2065438+From March to April, 2006, the commuter train from Kunming Wangjiaying Station to Shizui Station was stopped due to equipment maintenance. It resumed operation in May of the same year.
9. From 20 17, 12 and 13, the commuter trains between Shizui Station and Wang Jiaying Station were suspended for two and a half years. After the completion of the construction of Line 4, it is expected to resume construction in the first half of 2020, with operational conditions.
On the morning of July 20th, at 20 10 and 20 18, the Kaiyuan Station of Silent 15 was reopened. With the strong support of China Railway Kunming Bureau Group Co., Ltd., Kaiyuan relies on the existing Yunnan-Vietnam railway meter-gauge railway to build it into a north-south rail transit bus train. As a sightseeing railway, this railway has seven stations. 7 times a day, from 7: 30 am to evening 19:50 * *, with a running time of 40 minutes.
1 1, 2019 March 10, Yunnan-Vietnam Railway opened the transcontinental sea-rail combined transport channel for the first time, and transported goods from Oceania for the first time.