Since the first power generation in 1976, the plant has generated more than 30 billion kwh. At present, it has a large number of advanced equipment such as automatic hydrological forecasting, automatic dam observation and automatic unit monitoring. Have a talented team with excellent quality and style; In the development, construction, operation and management of large and medium-sized hydropower projects, they all have strong professional skills and talent reserves; It has a scientific and complete management system and culture, which provides a solid support for the outstanding performance of the enterprise mission.
Bailongjiang Qilinsi Hydropower Station is located on the main stream of Bailongjiang River in Zhongmiao Township, Wenxian County, Gansu Province. The designed installed capacity of the power station is1110,000 kilowatts, and the designed annual power generation is 447.7 million kwh, with a total investment of 925.4 million yuan. The first unit is scheduled to be put into operation in May 2008.