Roads
Pianguan County’s transportation is mainly highways. The Yellow River Diversion Highway from Pinglu to Wanjiazhai crosses the central part of the county, and the original trunk road from Pingguanyang to Chuanmao in Inner Mongolia It passes through the county and has many simple roads centered on the county seat. The total length of roads in the county is 249 kilometers, including 66 kilometers of provincial roads, 129 kilometers of county roads, and 44 kilometers of township roads. All 15 towns in the county are connected to cars, and the traffic congestion situation has been greatly improved.
In 2012, Pianguan County *** completed 18 cement roads 95.7 kilometers leading to the village, 29 sand roads 152.5 kilometers leading to the village, and 7 county and township highways 76.4 kilometers long.
In 2012, the highway completed 7 key projects including the Yaohe Line Urban Road, Laoniuwan Tourist Road, and Shangli Line, as well as new rural construction pilot villages such as Fangcheng, Yaping, Lougou, and Chenjiaying. Promote the hardening project of streets and lanes in the village. The feasibility study report of the 34.5-kilometer national defense readiness road from Sheshenya to Zhaizhai was completed and passed the provincial and departmental project approval review.
In 2012, 37 kilometers of civilized roads were maintained, 3 three-star road maintenance teams were installed, 5730m2 of oil road slurry and potholes were treated, 12546m2 of sand road surface was treated, 8600m2 of water-damaged roadbed was treated, and 18 bridge guardrails were added. m/1 place, 8 dangerous bridge signs/4 places, 1 speed bump, and 487m of protective wall.
Ferry
There are many ferries along the Yellow River in Pianguan County. Wooden boats can be used as far south as Hequ, Baode and Jundu, which facilitates material exchange with other places.
Parking Stations
In 2012, 80 new temporary parking spots and 6 passenger parking sheds were added. The passenger bus rate in villages reached more than 90%; the county's highway passenger volume reached 210,000 passengers; freight volume reached 1.75 million tons.