Airport relocation
Kuqa airport is sandwiched between the county seat and the chemical industry park. The airport can't stretch its legs and feet, and the county town and the park are also subject to various constraints. Fortunately, this situation will soon change with the relocation of random fields. After completing a series of project establishment, demonstration, investigation and re-demonstration, on June 5438+ 10, 2008, the State Council and the Central Military Commission jointly issued the Reply on Agreeing to the Relocation of the Civil Airport in Kuqa, Xinjiang.
Kuqa Airport was built in 1930s. Although it has been rebuilt many times, the runway of the airport is only 1700 meters, which is a 3D airport that can only take off and land dozens of small planes. According to local people, Kuqa Airport was originally located in the suburbs, separated from the county seat by a certain distance, and lived in peace with each other. In a flood in 1958, the old city of Kuqa was flooded. When rebuilding the new town, the relevant parties chose the address near the airport.
At that time, Kuqa County was just a small building with two or three floors, which had no influence on the take-off and landing of aircraft. Today, decades later, with the great development of economy and society, there are not only high-rise buildings in Kuqa, but also petrochemical industrial parks have mushroomed. As a result, the civil aviation department has clear restrictions on the height of buildings around the airport, but the buildings in county towns and parks are not always willing to stay at the level of "small and short". And the airport runway is next to the residential area, and there is no place to extend it.
In May 2004, the relocation of Kuqa Airport entered the project preparation stage. The new airport is designed according to 4C standard. The main construction projects include 2600 meters of runway and 5 100 square meters of terminal building, with a total investment of 243 million yuan. It is 38 kilometers away from Kuqa County, located in the central area at the junction of Kuqa, Shaya and Xinhe, with a population of 700,000 within 40 kilometers, covering 3 counties, 5 industrial parks and 3 large oil and gas fields.
"If the new airport can be started as scheduled, it is expected to enter the trial stage before 20 10." As the main battlefield of oil and gas development in Tarim Basin, the relocation of Kuqa Airport is imperative from the perspective of regional economic development and radiation-driven effect on surrounding areas. The relocation project of Kuqa Airport in Xinjiang has been approved by the State Council and the Central Military Commission, and will be designed and constructed according to 4C standard. After completion, it can transport 240,000 passengers every year.
The old airport of Kuqa was built in 1939, with two shifts every day. Because in the county, it has affected the construction and development of Kuqa county. After the completion of the new airport, it is of great significance to give full play to the advantages of the resource strategic base in Kuqa area, integrate the transportation system and improve the investment environment. After the completion of the new airport, it will be managed by local authorities, and the Civil Aviation Administration will implement industry management.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.
A possible version:
Online friends
Recently, people have had a heated discussion about whether students should make frien