Souvenir:
1827: Alter hafen started construction.
1847: Neuer Hafen started construction.
1872: Caesar Hafen 1 phase starts.
1897: The Kaiser Schleuser River, which separates the Kaiser Harbor Basin from the Weize River, has been opened.
1906- 1908: Phase II, Phase III and Verbindungshafen of Caesars Harbor Basin started continuously.
1926: banana transit terminal put into use.
1927: north lock started.
1928: Columbus Cruise Terminal completed.
1940- 1945: Some port facilities were severely damaged during World War II.
1957: Ro-Ro terminal starts operation.
1958: Construction of the second cruise facility began.
1968: container operation started in Nordhafen. In the same year, the construction of coastal container terminals began on the banks of Weixi River.
1970: The first barge carrier docked in Bremen.
1972: 1000-meter-long coastal container terminal 1 was completed as a whole.
1974: the construction of BLG general cargo terminal in bremerhaven began.
1977: Caesars Harbor Pool Bus Terminal put into use.
1978- 1980: expansion of coastal container terminal begins.
1984: Newly-built banana transfer terminal connecting the harbor basin was put into use.
1986: Cold storage of container terminal opened.
1992- 1997: Container Terminal Phase III Project
2000-2003: 3a-stage construction of container terminal.
2004-2008: The fourth phase of container terminal construction.