History of Shangyoujiang Hydropower Station
1957 65438+1On October 7th, the production preparation working group of Shangyoujiang Hydropower Station was established. On August 26th, with the approval of Wuhan Electric Power Administration, the production preparation working group of Shangyoujiang Hydropower Station was cancelled, and Shangyoujiang Hydropower Station was established, which belongs to Gannan Power Grid Project Preparation Office.

1On June 20th, 957, the dam was completed,1On August 29th, 957, the reservoir began to store water.

1957 10 Approved by the General Administration of Hydropower Construction of the Ministry of Electric Power Industry, the startup committee of Shangyoujiang Power Station was established to plan the commissioning of the unit. Chairman Shen Xinxiang (Deputy Director of Hydropower Construction Bureau), Vice Chairman (Deputy Director of Wuhan Electric Power Administration Bureau), Zhou Ruozhuang (Deputy Director of Gannan Regional Administration Office) and Zhai (Deputy Director of Shangyou Hydropower Engineering Bureau). The start-up committee consists of office and operation headquarters.

From 1957, 10, 16 to17, No.4, No.3 and No.2 hydro-generator sets started trial operation successively.

1957165438+1October 30th, the power generation ceremony was held. 250 guests from all over the country and 4500 employees of Shangyou Hydropower Engineering Bureau attended the ribbon-cutting ceremony. Zhang Zhe, Director of Shangyou Hydropower Engineering Bureau, delivered an opening speech, and Yang Shangkui, First Secretary of Jiangxi Provincial Party Committee, Ouyang Wu, Vice Governor, Shen Xinxiang, Director of Starting Committee, and Liu Ruisen, First Secretary of Gannan District Committee delivered speeches respectively. The congress read out more than 30 congratulatory letters from all over the country, and also read out a congratulatory letter to Comrade Mao Zedong, President of the Central Committee of the Communist Party of China. Yang Shangkui cut the ribbon for official power generation. Accompanied by Zhai, Bai, secretary of Jiangxi Provincial Party Committee, started the hydro-generator set.

1957 65438+On February 5th, the high-voltage transmission line was completed, and the Shangyoujiang Hydropower Station officially supplied power to Ganzhou. On June 5438+00, the project was formally signed by the contractor and handed over to Shangyoujiang Hydropower Station. On June 5th, at 38+08, Minister of Electric Power Industry Liu and Soviet experts visited Shangyoujiang Hydropower Station.