The Historical Evolution of Beijing Urban Construction Design and Research Institute Limited Liability Company
1In July, 958, the Third Survey and Design Institute of the Ministry of Railways and the Beijing Metro Construction Office jointly established the Metro Design Office, which belongs to the Third Survey and Design Institute of the Ministry of Railways.

Beijing Metro Bureau was established in August, 1958. 1October 1 165438 and may 1959, drilling teams and survey teams were established one after another. The bureau has a geological department. 1In August, 960, the subway design room was moved from Tianjin to Beijing and transferred to the leadership of Beijing Metro Bureau.

1961March, drilling team, survey team and geological department merged to form survey team, which was led by underground railway design department and renamed as underground railway survey and design department.

1 961July, the subway preparation was suspended, the subway bureau was cancelled, and the subway survey and design department was placed under the leadership of the railway professional design institute of the Ministry of Railways in June, 1962,1. 1 96365438+1October1,transferred to the leadership of the Research Institute of the Ministry of Railways, and renamed as the Underground Railway Research Institute of the Railway Research Institute.

1965 On February 4th, after President Mao Zedong gave instructions on the construction of Beijing Metro, the Beijing Metro Bureau was re-established on May 6th, 5438+0, and the Metro Research Institute returned to the leadership of the Metro Bureau and changed its name to Metro Survey and Design Institute.

1in March, 970, the subway survey and design department was changed to the railway corps underground railway survey and design team, which was organized at the regiment level and code-named 507 troops. It was first compiled under the custody of the Railway Corps Division 15, and then led by the Railway Corps New Town Command.

1may, 975, the unit code was changed to 89 122.

1in March, 1976, the tracking and design team of the railway corps underground railway was changed to the survey and design team of the Beijing office of the Capital Construction Engineering Corps, with the code name Jian Zi 9 18.

1 978 65438+February1,Beijing office of infrastructure engineering corps was changed to Beijing headquarters research and design institute. 1980 On March 24th, with the approval of the State Council and the Central Military Commission, the scientific research and design institute was changed from regimental units to divisional units, and the design office and survey team were changed from battalion units to regimental units. At this time, the hospital management organization has four design rooms, namely, political department, comprehensive planning department, hospital affairs department, road and bridge department, civil construction department, industrial construction and equipment department, a scientific research institute and a survey team.

In July 1983, 1, the troops were collectively transferred to other jobs and changed to design institute of Beijing Urban Construction Engineering Corporation. 1983 July 12 was renamed Beijing Urban Construction Design and Research Institute with the approval of Beijing Municipal Construction Committee, and it is still under the leadership of Beijing Urban Construction Corporation. By the end of 1990, the management institutions of the institute were: institute office, business development department, technology development department, architectural design room, structural design room, equipment design room, subway and light rail transit research institute, budget room, computer room, labor and personnel department, finance department, administration department, collective economic management department and housing development department. Party-mass system consists of Party Committee Organization Department, Trade Union and Youth League Committee. Subordinate units are: Survey Department, Hainan Branch, Waterproof Company and Decoration Department.

In July 2000, the joint-stock system was reformed and approved by Beijing Administration for Industry and Commerce, and it was named "Beijing Urban Construction Design and Research Institute Co., Ltd.".