Current location - Music Encyclopedia - Chinese History - How many issues are there in Shanghai 1 15?
How many issues are there in Shanghai 1 15?
Shanghai 1 15 Line History

On February 29th, buses from Shanghai Railway Station North Square to Shuangyang Road 1, 1987, 1 15 were opened.

2. 199 1 year165438+1on the morning of October 23rd, 1 15, the bus collided with a truck and the fuel tank exploded and caught fire. Meng, the conductor, rushed into the fire regardless of his personal safety, pulled open the door with all his strength and evacuated all the passengers, but he was seriously burned.

In March and June, 1992, 1 1, the bus-only line ZX 1 15 was opened, with the same stop as 1 15, and it was later extended to Songhua River Road and renamed as 5/kloc.

4, 65438+August 0995, 65438+May, and Chifeng Road and Yutian Road were changed to a one-way street heading for Shanghai Railway Station, and Chifeng Road and Zhongshan North No.1 Road were driven according to the original line.

5. After 2000, the terminal was temporarily adjusted to Jingyu South Road.

6. On April 28th, 2004, in order to cooperate with the construction of Zoumatang and Qiujiang sewage interception projects, Fushun Road, Anshan Road, Anshan Branch Road, Zhangwu Road and siping road Shanghai Station were temporarily changed to the original line, and siping road, Zhangwu Road, Fuxing Road, Anshan Road, Jinxi Road, Tieling Road and Shunlu Shuangyang Road were temporarily changed to the original line.

7. On March 3, 2007, with the reconstruction of Zhangwu Road, we temporarily changed the direction of Shuangyang Road and drove along the original lines of Chifeng Road, siping road, Zhongshan North Second Road and Jiangpu Road. The direction of Shanghai Railway Station will be temporarily changed to Jiangpu Road, Fushun Road, Anshan Road, Anshan Branch Road and Zhangwu Road, and the original line will be followed.

8. On July 5, 2007, it extended to Yanji East Road and Jingyu East Road.

9. June, 2007165438+1October 17 Yanji Middle Road, Huangxing Road and Fushun Road were temporarily diverted to Shanghai Railway Station to drive along the original line.

10, June 2008 10, in order to cooperate with the reconstruction of Shanghai Railway North Square, the terminal was temporarily adjusted to Yongxing Road. 20 10 12 moved back to the bus hub after the transformation of the north square of Shanghai Railway Station.

1 1, 201/April 10,15 merged with 5 15,1/kloc-.

12,2011year165438+1October 26th 5 15 was renamed as 1 15.