On the morning of August 30th, 20 14, a mobilization meeting for house expropriation, compensation and resettlement in Luo Zhuang Railway Station area of Linyi City was held.
On the morning of June 10 this year, the second meeting of Linyi City Planning Commission on 20 15 deliberated and approved in principle the planning schemes such as Yimeng Road Crossing Yanshi Railway Overpass and Linyi Station Passenger Transport Facilities Reconstruction Project.
20 15,10/on October 22nd, Linyi Railway Station Construction and Development Co., Ltd. released the second EIA announcement on Langya News Network for the construction of Yimeng Road under Yanshi Railway Overpass. This paper comes from the total length 1236m of the Langya network project invested and constructed by Linyi Railway Station Construction and Development Co., Ltd., which starts from the north side of Jinyuan Road about 100m, passes through Jinyuan Road, Taoran Road, Yanshi Railway and the planned military and civilian road to the south, and ends at Qinghe North Road, and Qinghe North Road passes through Taoran Road and Yanshi Railway. 6-lane to 8-lane in both directions, the design speed of the main motor vehicle lane is 60km/h, and the design speed of the ramp motor vehicle lane is 40 km/h. The main bridge of the overpass is a four-hole reinforced concrete frame, which is externally connected with the reinforced concrete frame box aisle, Taoran Road lower frame bridge, U-shaped frame closed approach road and retaining wall. The estimated total investment is 491687,900 yuan.