For 20__ years, under the correct guidance of company leaders and mine leaders, our department has always adhered to the safety production policy of "safety first, prevention first and comprehensive treatment". By strictly controlling the technical quality of mechanical and electrical equipment installation projects and strengthening the maintenance of mechanical and electrical equipment, we have paid close attention to the implementation of various tasks, ensuring the safe operation of mechanical and electrical equipment in the whole mine and completing various safety production tasks assigned by the mine department. Now the annual work will be briefly summarized from the following aspects:
First, the completion of the main indicators of mechanical and electrical safety production work
1. Safe operation of electromechanical equipment. In 20__ years, the mechanical and electrical equipment of the whole mine operated smoothly, with no minor injuries or above mechanical and electrical accidents.
2. Mechanical and electrical equipment "four rates" statistics. In the past 20 years, the comprehensive intact rate of mechanical and electrical equipment in the whole mine is 96.4%, the waiting rate is 2. 1%, the accident rate is 0, and the explosion-proof rate is 100%.
Second, the mechanical and electrical work and other work completion
1. Electromechanical installation project:
(1) Completed the installation, debugging and operation of the crusher of the screening system.
(2) Completed the transformation, debugging and operation of the main hoisting system.
(3) Completed the installation and debugging of the cantilever roadheader.
(4) Completed the belt replacement, installation and debugging of the belt conveyor in the main shaft.
(5) The inquiry and bidding of double-circuit overhead lines in 10KV mine have been completed.
(6) Completed the installation, debugging and operation of mine video monitoring system.
(7) Complete the inquiry and bidding of double-beam crane.
(8) Complete the inquiry and bidding of raw coal air separation system.
(9) Complete inquiry, bidding, equipment procurement, debugging and operation of battery electric locomotive.
(10) Complete the inquiry and bidding for civil engineering of electromechanical and fully mechanized workshop.
2. Equipment inspection, maintenance and transformation:
(1) Complete the inspection of mine electromechanical large-scale equipment "including three-ring connection, wire rope and flameproof bolt".
(2) Completed the monitoring, monitoring, maintenance and technical agreement.
(3) Completed the maintenance of air compressor.
(4) Completed the inquiry and bidding of lightning protection project.
(5) Completed the preventive test and inspection.
(6) The cleaning and leak-trapping welding of the water heater used in the staff bathhouse has been completed.
(7) Completed the commissioning and operation of self-provided diesel generator and generator.
3. Environmental protection work:
(1) Complete the inquiry work in the early stage of technical transformation of gangue dump system.
(2) Complete the cleaning of the sewage treatment plant.
(3) Complete the installation, debugging and operation of the mine dust sensor.
(4) The coal dust seal of vibrating screen and belt conveyor in coal yard has been completed.
(5) Chlorine dioxide in the clean water pool of domestic sewage treatment plant has been put into use, so as to ensure the domestic bathing water for employees.
4. Carry out winter heating management:
(1) In our mine, we carried out the activity of "Checking the Safe Use of Electricity for Coal Mine Heating and Electric Heating Users", actively publicized the operation norms, and improved the miners' awareness of safe use of electricity and their self-prevention and self-rescue ability.
(2) Continuously improve the management system and the responsibility system for safe production, and formulate relevant regulations for heating and electricity consumption in winter according to the actual situation of our mine, which further improves the safety management level of electricity consumption in winter in our mine.
Three, mechanical and electrical equipment safety management
1. Continue to do a good job in the arrival acceptance, well entry inspection, equipment installation, operation, maintenance, overhaul and equipment material recovery of mechanical and electrical equipment in the whole mine.
2. Further strengthen the management of underground explosion-proof equipment, arrange special personnel to be responsible, and further improve and standardize the inspection account of underground explosion-proof equipment.
3. Conscientiously implement the principle of combining equipment use and maintenance, who uses, manages and maintains, who is directly responsible for safety, implements the task responsibility system, implements the main equipment contracting mechanism, strictly implements the post responsibility system and equipment operation procedures, and requires operators to strictly implement the equipment site handover system, conduct regular maintenance and switching operation tests of large fixed equipment, and make records of various operations and maintenance.
4. Special equipment management: Our department conducted a special inspection of special equipment in the whole mine, contacted the Bureau of Quality and Technical Supervision in time to inspect the relevant special equipment (boilers and pressure vessels) in our mine, and organized relevant operators to participate in professional training, certificate review and assessment on time.
Four, mechanical and electrical safety and quality standardization construction
The quality standardization construction of our mine requires the higher authorities to reach the second grade, and electromechanical is an important part of the quality standardization construction. According to our own actual situation, our department has specially formulated the electromechanical safety and quality standardization plan and implementation rules, and cooperated with all units to continue to do a good job in weekly electromechanical quality standardization inspection and end-of-month assessment. Check for leaks, make plans, study existing problems, formulate measures, and take the time to implement rectification, so as to achieve strict on-site quality standardization management, strict quality standardization inspection and acceptance, ensure that quality standardization reaches the standard constantly and dynamically, and make the electromechanical quality standardization construction of our mine reach a new level.
Verb (abbreviation of verb) technical management
1. Our mine implements planned power outage operation, strictly implements the power outage application and power outage working ticket system, puts an end to unplanned power outage accidents in the mine and ensures the safety of power supply in the mine.
2. Drawing of electromechanical drawings. According to the latest underground mining progress and equipment relocation and installation, all kinds of mechanical and electrical drawings are updated in time, and the switch with load change is set and calculated to ensure the safety of underground power supply.
3. According to the actual situation of our mine, we have completed the preparation of the 20-year mechanical and electrical equipment renovation plan.
4. The technical performance test of large-scale equipment and ancillary facilities in our mine was completed in time according to the regulations of higher authorities (performance test of two main ventilators, performance test of belt conveyor in main shaft and drive shaft, performance test of three air compressors, performance test of three main drainage pumps and combined drainage test, performance test of overhead man-vehicle and online detection of steel wire rope, online detection of main hoisting steel wire rope and online detection of endless rope winch in track alleys).
5. Entrust a qualified unit to detect stray current in our mine.
6. Actively contacted the county meteorological department and completed the inspection and testing of lightning protection facilities and equipment in our mine.
7. The insulation performance of the above-ground and underground insulation appliances is tested.
8. Completed the calibration of pressure gauge and vacuum gauge of above-ground and underground related equipment.
9. In accordance with the "Regulations", continue to do a good job in relay protection inspection and setting of distribution system, underground grounding resistance test and preventive maintenance of large fixed equipment.
2.2022 Personal Work Summary of Maintenance Electrician
My name is __X, and I am an ordinary electrician in __X village. In _ _ _, with the care and support of the power supply station, all economic and technical indicators and tasks were well completed. The complete success of the work is first attributed to leaders at all levels and colleagues around me. I just did what I had to do and did my duty. After years of training and tempering, I fully understand the enterprise spirit of "loyalty and dedication, pioneering and enterprising, learning and innovation, and quality service" advocated by superior leaders and the profound connotation of a series of advanced enterprise cultures. In Huilongsi village, as an electrician, although he can't directly create economic benefits for the local area like other businesses, he plays an important role in escort, just like a small screw on the machine.
Looking back on my work in the past year, I have mainly done the following work:
First, the technical indicators issued have been successfully completed.
By the end of 65438+February, the power supply in our village was completely completed, the electricity fee was recovered at zero per month, the safety production was "three noes", the safety record was maintained for a long time, and the quality service and honest service achieved good results, and the complaints reached "zero" throughout the year.
2. Safety in production has remained relatively stable.
In the past year, according to the requirements of "clear responsibility, strict discipline, strong supervision and clear rewards and punishments" put safety inspection and safety production at the top of all work, strengthened the implementation of safety work, established all-round and whole-process safety production, actively participated in various safety activities organized by the Bureau, paid attention to the investigation and study on the construction site to understand the truth, solved practical problems and paid attention to safety management in the project construction process. In this year's tense rural power grid, due to effective cooperation, the whole process of safe production is ensured, accidents are eliminated, equipment maintenance and tree obstacle treatment are in place, and the distribution accident rate is reduced. The intact rate of distribution equipment is 65,438+0,000%. Focus on the actual work, check the hidden dangers, check the signs of accidents, check the unsafe factors, and thoroughly remove the safety dead angle.
Three, earnestly implement the service and standardized management.
Over the past year, guided by policies and regulations, and aiming at quality service, we have earnestly served farmers, improved service quality, standardized working procedures, provided services to customers, and insisted on 24-hour telephone access. Adhere to the door-to-door service for elderly customers with mobility difficulties and implement the "heart-to-heart" project. As long as you receive a call for repair, you should go to the door for repair immediately, and the general accident should be repaired immediately. It is not too late to explain the situation of special accidents. For users with limited mobility, take the initiative to collect fees and run three or four times a month. Integrity service tries its best to reduce arrears and power outages, which is well received by users.
In practical work, I am more active. From August to September this year, the Beijing Olympic and Paralympic Games attracted worldwide attention. In order to ensure that people can watch TV programs safely and timely and save electricity, I gave up my rest time, worked for more than ten hours every day, checked the lines and equipment, and dealt with all kinds of hidden dangers in time to ensure that there was no power outage during this time. During the peak electricity consumption this autumn, there was no power failure accident caused by my responsibility, which ensured the farmers to produce electricity. With hard work and enthusiastic service, we have been satisfied by our customers. In short, whether it is day or night, windy or rainy, as long as we receive an accident call, we can help our customers solve the problem as quickly as possible. Copying, inspection and collection are the focus of our work, which directly relates to our economic benefits. In our work, we seek truth from facts, read the meter on time every month, do not estimate or omit copying, review it in time after copying, and recover our income, no more or less. We put the responsibility of electricity charge recovery in place before electricity can be sent out. If we can't find anyone on a trip, we will block it in the morning and ask for it at home at night. It's really difficult, and through unremitting efforts, we try our best to ensure the timely recovery of the monthly electricity bill. There were no complaints throughout the year, which standardized the management of rural electricity consumption, reduced the burden on farmers and established a good image of our power supply enterprise among farmers.
Although I have made some achievements in my work, I should also face up to the existing problems and shortcomings. In the new year, in order to achieve higher goals, we should improve the industry style and work style and further strengthen work discipline. The awareness of quality service and honest service needs to be further strengthened.
3.2022 Personal Work Summary of Maintenance Electrician
Since I took office, I have constantly strengthened my self-cultivation, strived to improve my ideological and moral level, earnestly deepened the study of various cultures and professional knowledge, constantly explored new knowledge, made pioneering efforts, actively carried out all work within my intellectual scope, fully performed my duties, and played a good exemplary role. Taking an active part in technical exchanges and scientific and technological innovation activities, Dida has done a good job of passing on, helping and leading, and fully completed various tasks and indicators assigned by superiors, which has played its due role in the company's production development. I will summarize my professional and technical work since I took office as follows:
First, consciously strengthen theoretical study and strive to improve personal quality.
Without a firm and true political direction, there will be no positive guiding ideology. In order to constantly improve my political and ideological quality, I have been paying close attention to national affairs and the situation at home and abroad in recent years, analyzing the impact of changes in the situation on enterprises, and putting this idea into practical action in the production process to ensure that my thoughts and actions are always consistent with _ _ _ and enterprises. At the same time, I also bring this idea into my work and study, and constantly pursue my own progress. Some people say that if a person wants to become a talent, he must be a man first, which makes sense. In other words: if a person wants to succeed in his career, he must first learn how to be a man! Especially those who do our highly technical work, we should look at things attentively, concentrate on things and learn with an open mind. There is no room for carelessness and mistakes. First of all, we should have a correct working attitude, good professional quality, be serious and responsible for our work, obey the arrangement of leaders, listen to others' opinions and suggestions with an open mind, unite colleagues, be polite to others and serve warmly.
Second, correct working attitude and play a leading role.
Since I joined the company, I have been engaged in all electrical affairs, including safety and quality supervision and inspection during all capital construction periods. I am well aware of the importance of electrical management during construction, especially the electrical infrastructure and most of the invisible projects. It is necessary to supervise and inspect at any time, solve problems when found, and never rush into it, otherwise the future trouble will be endless and can never be eradicated. This is a test and responsibility for our electrical management.
As the monitor of an electrician class, I am duty-bound to bear the responsibility and burden. Therefore, in the usual work, I not only ask the team members to be careful in supervision and inspection, but also know that while the iron is hot, they must be hard. I made some strict demands on myself. First, when I encounter dirty, tired and dangerous work, I will walk in front of the workers and do more and more effectively than the workers. Second, when encountering technical difficulties, we should step forward and try our best to overcome them. I always insist on doing everything well and putting the interests of the company first. Including after the completion of the production process, sometimes it is a race against time to deal with large and small electrical equipment failures, winning valuable production time for the company and laying a solid foundation for the company's development. I think that since I want to take the test as a technician, I will be better than ordinary workers in many aspects such as business level. When the company assigns tasks, when it is difficult for ordinary workers to complete them, they should take the initiative and not shirk with the workers. They should bravely shoulder the heavy burden like technicians. Usually, I not only ask myself this way, but also do it according to these requirements in practice. So I want to play the role of a technician in the company and establish a good image of a technician.
Third, safe production, to ensure the safety and quality of the company's electricity.
1. With the long-term operation and the increase of load, problems such as aging, measurement error and insufficient capacity are becoming increasingly prominent, resulting in serious resource loss (power loss) and security risks. At the beginning of the year, the center invested a lot of money to update the electricity meters in all the company's business stores and replace and transform the internal irregular lines. 1 4, and completed on April/0/8. Replacement meters are allocated according to the capacity of each store. The models of electric meters are: electronic single-phase DDS438 type 5-20a, 10—40A-40a, 20-80a, and electronic three-phase four-wire electronic meters 20-80a, totaling 2200. Assist the construction team to rectify 1572 indoor irregular lines.
2. Due to the rapid development of business households, the demand for electricity is increasing year by year, and the center has invested huge sums of money to ensure the power supply safety of power grid lines, trunk lines and indoor lines. In May, all groups of power lines were evaluated, and the overloaded lines were expanded: 50MM2 copper core cable was newly installed. More than 80 air conditioning lines were installed during high temperature. Replace underground cables for four inclined cement poles in the market. Relieved the pressure of power supply line and passed the peak period of power consumption smoothly.
3. The power supply from West Power Distribution Room to Guanghua Footwear Base is a problem left over from history. On February 27 this year, the company's footwear base had a double-channel power supply reverse power transmission accident, which caused great security risks to the market power supply. The leaders of the center attached great importance to it, and the department timely replaced four DW 16-2000A intelligent circuit breakers in the east-west distribution room. Under the mediation of the three parties, the department arranged the electrician team to cooperate with the power supply company, and completed the power distribution project of the shoe base perfectly.
Fourth, implement the responsibility for production safety.
1, the company leaders put safety in production first, and the section chief repeatedly told each member about his pre-attendance safety and overhead maintenance at the morning meeting every day. In particular, the section chief and Ye engineer of each production tool personally inspected and supervised, and the tools found to be seriously defective and damaged were destroyed in time, and no accidents such as personal injury, power grid, equipment and fire occurred throughout the year.
During the period from February to September, in order to ensure the safety and quality of electricity consumption during the peak period of high temperature, the company arranged a special person on duty system for the east-west power distribution room and the box-type power distribution room, promptly eliminated equipment failures, recorded equipment operation every hour, and ensured the reliable operation of each circuit.
3. Conduct routine water and electricity inspection for the company and Guanghua Footwear Base every day, and handle the situation in time if found. Also cooperate with the company's monthly safety inspection. Timely rectification of matters with hidden dangers of hydropower.
4. Regularly check the planned power outage control system, street lamps and broadcast monitoring system every Friday, and make inspection records. More than 50 street lamps/kloc-0 have been replaced this year. If any abnormal situation is found, adjust it at any time, and report the problems to the company leaders in time.
5. Before each typhoon comes, conduct a comprehensive inspection on the internal power supply network, light poles and cables, outdoor billboards, electric shutter doors and drainage pipes. In order to plan ahead.
Five, fully cooperate with equipment maintenance, strengthen equipment maintenance.
Combined with the opportunity of low power consumption, overcoming difficulties and diverting power, all equipment was overhauled, pre-checked and eliminated in turn in mid-June165438+1October. The equipment maintenance of the East-West Power Distribution Room cooperated closely with the construction personnel, and completed the switching operation, safety measures arrangement and on-site safety supervision and management of the power transmission equipment. During the maintenance, oil leakage and discharge of the high-voltage cable in the west distribution room were found in time, and the original 70MM2 copper-core high-voltage cable was replaced with 120MM2 copper-core high-voltage cable. Replace 2 sets of disconnectors (2000a), 3 sets of DW 15 circuit breakers (630a), 44 self-healing capacitors and 5 sporadic accessories in the east-west distribution room. At the same time, the base, pull rod and box surface of some corrosion equipment in high pressure chamber were treated with anticorrosion. Operation of single equipment, power switching, cleaning and maintenance, and equipment acceptance after maintenance.
Six, do a good job in the work of the whole group, the establishment of water and electricity, radio, monitoring files.
1. This year, the electric meters will be replaced, the information of the electric meters will be improved, the construction records of the electric meters will be kept, and the removed old electric meters will be marked and put into storage according to each household in the group. List the electricity consumption reading of the old electric meter and the meter number and capacity of the new electric meter.
2. Make a planned water use report for the company 13 water meter every month and send it to the Municipal Water Saving Office. The readings of the active and reactive power meters of the east-west distribution room and the spacer transformer shall be recorded, and the data shall be registered and filed every time.
3, completes the power supply equipment maintenance, annual inspection report. Establish a special account for major equipment, and record the maintenance items, models and quantities of replaced equipment and materials, and the operation of the equipment after maintenance.
4. Manage the electrician warehouse. Regularly declare the material consumption and list the materials in and out of the warehouse, ensure a certain inventory of common spare parts, and register the materials in the place of use.
Seven, strengthen business learning, improve the technical level.
It's never too old to learn this sentence is my motto. Today, with the continuous development of science and technology, you will fall behind if you don't study for a day. Especially electrical automation, no one can fully grasp everything. It is constantly developing and updating, just like computer software, it is updated every day and has been developing. Maybe you knew it yesterday, but it will be different in two days, and more advanced things will be put in. So I usually read more professional books as long as I have time.
Over the past few years, I have collected a large number of new professional books and materials, constantly enriching myself and constantly mastering new knowledge. For example, electrical design and drawing, electronic technology, modern frequency conversion technology, DC application in industry and so on. In the process of learning this knowledge, I learned a lot of new knowledge, such as PLC programming control principle, ABB inverter setting and control principle, SIPMOS high-power bidirectional thyristor control principle and so on, which really benefited me a lot!
Not only did I broaden my knowledge, but also greatly improved my technical level, which also made me interested in learning higher-level theoretical and technical knowledge.
4.2022 Personal Work Summary of Maintenance Electrician
Looking back at 20__, I have a lingering fear. It was an ordinary year for me, and it was also a year of harvest for me. First of all, I would like to thank the company leaders for providing such a big life stage and giving me the opportunity to learn and develop! At the same time, I also thank the workshop leaders and the old masters for their careful cultivation, skills and valuable work experience! Let me absorb the most precious nutrients in this safe, healthy and harmonious soil. Over the past year, I have been strict with myself and conscientious. Mainly summarized from the following aspects:
I. Safety in production
1. Implement and improve the organization system for safe electricity consumption, and improve the safety management rules and regulations.
2, strengthen the workshop electricity safety management, consolidate the safety foundation.
3, a guarantee, users should ensure their own safety and the safety of others.
Secondly, in terms of energy saving and consumption reduction, I have actively applied what I have learned and made many contributions to the energy saving and consumption reduction of the factory. For example, in the aspect of factory lighting circuit transformation, under the condition of improving illumination, all equipment lighting is changed to energy-saving and long-life LED tubes.
Three, daily maintenance, the implementation of their respective responsibilities and work, equipment electrical routine inspection, power distribution cabinet dust inspection regularly, equipment motor and electrical cable inspection regularly, and strive to ensure the normal operation of equipment every day.
Four. Emergency treatment: the electrical emergency of the equipment should be handled on the post in time, and the handling situation should be reported to ensure the normal operation of the equipment at the first time.
After a year, I feel that I still have some shortcomings, such as lack of experience in dealing with unexpected accidents, working principle of electrical equipment, secondary protection and maintenance of operating equipment, and lack of a deeper understanding. In the future, I put forward some requirements for myself.
1) consciously strengthen theoretical study and improve theoretical knowledge.
2) Strengthen business study and improve technical level.
3) Improve your own quality and show your value in your work.
Today, with the continuous development of Jiong technique, if you don't learn it for a day, you will fall behind. Especially electrical automation, no one can fully grasp everything. It is constantly developing and updating, just like computer software, it is updated every day and has been developing. Maybe you knew it yesterday, but it will be different in two days, and more advanced things will be put in. So I usually have time to read more professional books. Broaden my knowledge and greatly improve my technical level. In the future study and work process, I will find more problems, ask more questions, consider more problems, discuss and solve more problems. When encountering difficulties, learn from the old masters, unite and cooperate, learn from each other and make progress together. Abide by the labor discipline of the company and workshop, I will always maintain full enthusiasm for work, treat my work seriously and responsibly, work hard, and strive to be a qualified, skilled, innovative and qualified electrical maintenance personnel.
5.2022 Personal Work Summary of Maintenance Electrician
Time flies, 20__ will wave goodbye to us soon; Time flies, 20__ years is coming. Looking back on the past year, I summed myself up as an electrician, "360 lines, each line is the best." After graduating from junior high school, I went to a technical school to study, intending to learn a technology that suits me. After careful consideration, I decided to study electrical and automation. I hope I can become an excellent electrician. After graduation, I studied well, and then I came to work in _ _ cement plant. Since my work, I have been engaged in the professional work of first-line electricians, being strict with myself and conscientious.
Over the past year, I have always devoted myself to my beloved electrician career with high working enthusiasm and positive working attitude, and contributed my blood to the development of _ _ cement plant. I am serious and responsible for my work, diligent in studying and assiduously studying. Actively participate in all kinds of study and training, and strive to learn electrician knowledge, power supply system knowledge, line devices, lighting devices, grounding devices, transformer operation and maintenance, motor maintenance, soft starter, instrument, DCS system and PLC control and other related knowledge systems. Every time I study, I learn some new theories and use them to guide my work practice. In practice, I will strictly abide by the rules and regulations.
In my work, I am practical and enterprising. When you encounter something you don't understand, ask others modestly. Work with Qi Xin, a member of the same team, learn from each other and make progress together. Patrol inspection together during work to find out the problems that affect normal production and solve the faults encountered during equipment operation. During the inspection, the insulation of the outgoing line is damaged and aged, the motor vibrates greatly, the temperature is high, the current is high, the bearing has abnormal sound, the carbon brush is on fire, the water resistance cabinet is short of water, the water temperature is too high, the transformer oil level is low, there is oil leakage and abnormal sound, whether the wiring meets the requirements of the nameplate, and whether the winding has open circuit, short circuit and grounding. , and summarize and record all kinds of fault phenomena and solutions in time to guide practice and improve their own performance. Some mechanical and electrical equipment put into production have the requirements of high degree of automation, high technical content and high technical precision. There are many kinds of mechanical and electrical equipment, and the technical level of maintenance electricians is also very high. As a technical school graduate, his cultural level is far from meeting the requirements of new technology, and he feels the pressure of learning. In the face of difficulties, I constantly enrich myself in practice, strive to improve my professional level and make myself more mature in my future work.
Electrician is a dangerous profession. All personnel engaged in electrical work must abide by the electrical safety management system, strictly implement the maintenance working ticket and predict the working time, and the person in charge of the work should go through the procedures of work permit, work extension and work termination according to the operating rules. As an electrician, safety is always the first, and the work of safety production is not only responsible for individuals, but also for factories. In order to ensure the safe operation of power distribution, the most important thing is to be good at analyzing the defects of equipment, correctly judge the faults and deal with them quickly. This requires the personnel on duty to have profound theoretical knowledge and skilled practical skills. It is also very important that the personnel on duty must have good psychological quality when dealing with emergencies. Only in this way can they play their technical level normally and ensure that production will not be affected.
In the new year, I will continue to improve myself. I firmly believe that I will do better in thought, technology and work. I will be more strict with myself, learn from other leaders and colleagues with an open mind and strive for greater progress in all aspects.
The spring and autumn years are like water, and the wind and rain years are brilliant; Years of heart-to-heart, hand in hand, and years of gratitude depend on you. I wish _ _ Cement Co., Ltd. a more brilliant tomorrow.